References

Alandia Engineering Group has been executing since 1983, Electrical, Instrumentation/Automation services, installations  and Engineering and Design Services working in close co-operation with various leading Companies, designers and contractors for new constructions  and Revamps worldwide.

STX Genesis Class, Oasis of the Seas and Allure of the Seas

Alandia Engineering delivered turnkey installation including all mechanical and electrical work for two areas. The contracts included one technical area consisting of seven electrical substations and one machinery area consisting of three converter rooms, including one IT UPS room. The total surface area of all spaces covered approximate 2000 sqm. For this project Alandia supplied mechanical and electrical design, manufacturing of prefabrications, installation of all equipment, piping, HVAC, insulation and all electrical works including high voltage connection. This employed work for approximate 80 000 man hours. The areas were successfully delivered on time, without remarks in excellent condition. 

Acergy Falcon

Alandia Engineering successfully completed the fire repair works onboard Acergy Falcon in Brest, France in July 2010 after 115 000 hours of work. We supplied manpower for cable removal and installation, including design and delivery of all cables and necessary installation materials. The following systems has been replaced: fire detection, public address, general alarm, CCTV, telephones, intercom, cable carousel, MCC´s & automation for the pipe lay system, main generator room power and control systems, ROV control room, etc. Re-commissioning of the Kongsberg systems was also carried out by Alandia Engineering in cooperation with Kongsberg Maritime. As an additional scope considerable work was required within the accommodation areas, and Alandia also provided the services of safety technicians, who provided invaluable support to the Acergy Group HSE team.

Product Tanker New building (3 ships)

Complete electrical installations onboard the Svithoid tankers oil tanker new buildings. This project was completed in co-operation with ASP Ship Management and SRC Shipyard.

Kongsberg Group

In close co-operation with Kongsberg Group Alandia Engineering have preformed several refit installations on K-Chief, K-Trust and Tank Gauging & Measurement.